archive-fr.com » FR » F » FRENCH-NUCLEAR-SAFETY.FR

Total: 531

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • ASN Guides (non-binding)
    doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home References ASN Guides non binding Mettre en favoris Share on References International rules Regulations ASN Resolutions ASN Opinions ASN Guides non binding Safety Rules National plan on management of radioactive materials and waste PNGMDR ASN Guides non binding advanced Search Filter by year Select a year All 2014 2013 2010 2009 2005 Published 22 12 2014 ASN Guide No 17 ASN Guide No 17 Contents of management plans for incidents and accidents involving the transport of radioactive substances Published 08 01 2013 ASN Guide No 13 ASN Guide No 13 Protection of Basic Nuclear Installations against external flooding Published 01 10 2010 ASN Guide No 16 ASN Guide No 16 Significant radiation protection events affecting patients in radiotherapy criterion 2 1 notification and ASN SFRO scale rating Published 04 07 2009 ASN

    Original URL path: http://www.french-nuclear-safety.fr/References/ASN-Guides-non-binding (2016-01-29)
    Open archived version from archive


  • Inspections
    Operators reports french only European stress tests CSA Videos Supervision of the epr reactor Principles for the construction of EPR Resources Project concerning the installation of an EPR at Penly Section map ASN About ASN Activities monitored by ASN The ASN doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home Inspections Mettre en favoris Share on Inspections European stress tests Supervision of the epr reactor Inspections ASN is responsible for the regulation of nuclear safety and radiation protection in France it is in charge of this regulation on behalf of the State to protect workers patients the public and the environment against the risks related to nuclear activities Regulation is the core business of ASN The rating scales INES scale For rating nuclear incidents and accidents ASN SFRO scale Applicable to radiation protection events affecting patients during a radiotherapy procedure ASN

    Original URL path: http://www.french-nuclear-safety.fr/Inspections (2016-01-29)
    Open archived version from archive

  • Stress Test News
    2012 2011 05 10 2012 11 32 am ASN has reservations about the communication of the European Commission ASN notes the communication of the European Commission on Thursday October 4 2012 on stress tests on nuclear power plants in Europe conducted after the Fukushima disaster claims to be based on the results published in the stress tests final report adopted on April 26 2012 ASN regrets the working methodology used by the Commission for drawing its conclusions These conclusions ignore some important recommendations of the stress tests final report Read more 28 06 2012 9 00 am ASN s 2011 report on the state of nuclear safety and radiation protection in France there is a before and an after Fukushima ASN imposes large scale safety reinforcement work on the licensees following the CSAs Today 28th June 2012 ASN presented its 2011 Report on the state of nuclear safety and radiation protection in France and also reviewed the follow up to the Complementary Safety Assessments CSAs conducted on the nuclear facilities in the wake of the Fukushima Daiichi accident Read more 04 05 2012 10 20 am Approval of the report on the results of stress tests on European nuclear power plants The European Nuclear Safety Regulators Group ENSREG and the European Commission have adopted on April 26 2012 the report on the results of the stress tests on European nuclear power plants This report responds to the request from the European Council on 25 march 2011 asking for the launch of stress tests on the European nuclear power plants to take account of the first lessons learned from the Fukushima accident Read more 03 01 2012 12 00 pm Publication of the ASN Report on the CSA ASN imposes enhanced nuclear facility robustness to extreme situations ASN is making public its report on the complementary safety assessments CSA carried out further to the Fukushima accident in Japan This morning the ASN President André Claude Lacoste delivered it personally to the Prime Minister Following the complementary safety assessments of the priority nuclear facilities ASN considers that the facilities examined offer a sufficient level of safety for it not to request the immediate shutdown of any of them At the same time ASN considers that for the continuation of their operation an increase in the robustness of the facilities to extreme situations beyond their existing safety margins is necessary as rapidly as possible ASN will therefore be requiring that the licensees take a series of measures and reinforce the safety requirements relative to the prevention of natural risks earthquake and flooding and risks associated with other industrial activities the monitoring of subcontractors and the handling of nonconformities Read more 17 11 2011 9 30 am ASN will issue its conclusions on the Complementary Safety Assessments CSA in early 2012 On completion of the Complementary Safety Assessment CAS process engaged further to its decisions of 5 May 2011 ASN will present its conclusions on these CAS at the beginning of 2012 Read more

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests/Stress-Test-News (2016-01-29)
    Open archived version from archive

  • ASN’s supervision of the Flamanville-3 reactor construction (EPR) : News
    nuclear power plants On 13th December 2013 further to the ASN inspectors findings concerning lifting and handling equipment for large components in NPPs ASN asked EDF to ensure the conformity of this equipment prior to any use Read more 25 11 2013 11 00 am Information Letter No 15 ASN monitoring of the EPR Flamanville reactor construction site notable points In the first half of 2013 ASN continued its monitoring of construction of the Flamanville 3 EPR reactor and various other manufacturing operations for this reactor ASN carried out several inspections The notable points observed over these last few months are detailed below Read more 08 03 2013 1 44 pm ASN monitoring of the EPR Flamanville reactor construction site notable points In the second half of 2012 ASN conducted several inspections for continued monitoring of the construction of the Flamanville 3 EPR reactor and various other manufacturing operations for this reactor The notable points observed over these last few months are detailed below Read more 08 10 2012 5 26 pm Information notice No 13 ASN monitoring of the EPR Flamanville reactor construction site notable points Since the end of 2011 ASN has conducted several inspections link to inspection follow up letters posted on line on asn fr that continue its monitoring of the construction of the Flamanville 3 EPR reactor and various other manufacturing operations for this reactor The notable points observed over these last few months are detailed below Read more 16 04 2012 9 30 am ASN lifts its reservations regarding the I C architecture of the Flamanville 3 EPR ASN considers that the changes EDF has made to the instrumentation and control I C architecture of the Flamanville 3 EPR are satisfactory and enable it to lift the reservations it expressed in October 2009 This position is based on the analysis by its technical support organisation IRSN and the opinion of the Advisory Committee for nuclear reactors Read more 21 03 2012 2 00 pm Information notice No 12 ASN s supervision of the Flamanville 3 reactor construction EPR ASN oversight of the Flamanville 3 EPR construction site continued during the second half of 2011 Details of recent findings are provided below Inspection of prestressing tendon duct installation work Manufacture of polar crane support brackets Oversight of complex concreting operations Quality control of tank pool and liner welding operations ASN report on the complementary safety assessments conducted by EDF after the Fukushima accident Repair of reactor vessel head Non conformances detected during the pipe manufacturing process Read more 12 09 2011 5 21 pm Information notice No 11 Highlights of ASN s inspection efforts at the Flamanville EPR construction site Since 2008 several inspections by ASN have examined the prestressing system 1 of the Reactor Building containment During construction of the first concreting lifts of the inner containment wall EDF notified ASN of noncompliance issues relating to the prestressing system see Information Notice No 8 In May 2011 new noncompliance issues regarding positioning of portions

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/Supervision-of-the-epr-reactor/ASN-s-supervision-of-the-Flamanville-3-reactor-construction-EPR-News (2016-01-29)
    Open archived version from archive

  • European stress tests
    videos Follow up Activities National Action Plans Supervision of the epr reactor Complementary safety assessments and European stress tests ASN in charge of the regulation of the French nuclear installations requested operators on 5 May 2011 to undertake complementary safety assessments CSA of their installations following the accident that occurred in Japan on 11 March 2011 The process which consists of in depth operating experience feedback from this event will be spread over several years as was the case after the Three Mile Island and Tchernobyl accidents The assessment approach responds to both the Prime Minister s and the European Council s requests to carry out a safety audit of the country s nuclear installations the complementary safety assessments are based on the provisions of the specifications approved by ENSREG last May In France these in depth safety examinations are carried out in all installations including research and fuel processing installations sub contracting has been taken into account in CSAs of French installations In June ASN received and examined with its technical support organisation IRSN memoranda presenting the methodology selected by each operator for conducting the CSAs 79 installations were considered high priority including 58 nuclear reactors operated by EDF on 15 September 2011 their operators submitted reports on the safety status of these installations in relation to the CSAs Reports relating to other installations will be submitted to ASN no later than 15 September 2012 When ASN its technical support organisation IRSN and expert groups have finished analysing these reports ASN will present its conclusions at the end of 2011 A final report will be sent to the European Commission by the French authorities no later than 31 December 2011 Stress Test News This section contains the latest information notices and press releases concerning the stress tests Read more Milestones for complementary safety assessments The 12 resolutions taken by the ASN Commission on 5 May 2011 require the various operators of nuclear installations to prepare a report in response to detailed specifications according to the following time line Read more Complementary safety evaluation of French nuclear installations ASN believes that it is essential to learn from the accident which occurred at Fukushima Daiichi nuclear power plant as it has been undertaken after the Three Mile Island and the Chernobyl accidents The in depth experience feedback will involve a long process stretching over several years Some lessons however can already be learned On 5 May 2011 the ASN Commission adopted 12 decisions requiring to licensees of French nuclear installations to conduct a complementary safety evaluation of their installations in the light of the accident which occurred in Fukushima The French High Committee for Transparency and Information on Nuclear Security HCTISN has contributed to the decisions drafting during its extraordinary meeting which HCTISN held on 3 May 2011 this committee approved the specifications submitted by ASN Read more ASN resolutions By the resolutions taken on 5 May 2011 the French Nuclear Safety Authority Autorité de sûreté nucléaire ASN has required all

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests (2016-01-29)
    Open archived version from archive

  • Milestones for complementary safety assessments
    ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home Inspections European stress tests Milestones for complementary safety assessments Print Mettre en favoris Share on Inspections European stress tests Stress Test News Milestones for complementary safety assessments Complementary safety evaluation of French nuclear installations ASN resolutions ASN report Targeted inspections Licensee reports french only European stress tests Stress Test videos Follow up Activities National Action Plans Supervision of the epr reactor Milestones for complementary safety assessments The 12 resolutions taken by the ASN Commission on 5 May 2011 require the various operators of nuclear installations to prepare a report in response to detailed specifications according to the following time line 1 June 2011 submit a memorandum presenting the selected methodology for conducting the assessment the organisation implemented to meet the deadlines set and the detailed structure planned for the report 15 September 2011 for priority installations including nuclear power plants the operators send a report presenting

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests/Milestones-for-complementary-safety-assessments (2016-01-29)
    Open archived version from archive

  • ASN resolutions
    nuclear installation Center Select a center Select a center 1 2 3 Next Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0274 of 26 June 2012 ASN resolution 2012 DC 0274 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Belleville sur Loire NPP Cher département in the light of the conclusions of the Complementary Safety Assessments CSAs for BNIs 127 and 128 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0275 of 26 June 2012 ASN resolution 2012 DC 0275 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Le Blayais NPP Gironde département in the light of the conclusions of the Complementary Safety Assessments CSAs for BNIs 86 and 110 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0276 of 26 June 2012 ASN resolution 2012 DC 0276 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Bugey NPP Ain département in the light of the conclusions of the Complementary Safety Assessments CSAs for BNIs 78 and 89 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0277 of 26 June 2012 ASN resolution 2012 DC 0277 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Cattenom NPP Moselle département in the light of the conclusions of the Complementary Safety Assessments CSAs of BNIs 124 125 126 and 137 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0278 of 26 June 2012 ASN resolution 2012 DC 0278 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Chinon B NPP Indre et Loire département in the light of the conclusions of the Complementary Safety Assessments CSAs for BNIs 107 and 132 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0279 of 26 June 2012 ASN resolution 2012 DC 0279 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Chooz NPP Ardennes département in the light of the conclusions of the Complementary Safety Assessments CSAs for BNIs 139 and 144 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0280 of 26 June 2012 ASN resolution 2012 DC 0280 of 26 June 2012 instructing Électricité de France Société Anonyme EDF SA to comply with additional requirements applicable to the Civaux NPP Vienne département in the light of the conclusions of the Complementary Safety Assessments CSAs for BNIs 158 and 159 Read more Published on 01 03 2013 ASN resolution ASN resolution 2012 DC 0281 of 26 June 2012 ASN resolution 2012 DC 0281 of 26 June 2012 instructing Électricité de France Société Anonyme

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests/ASN-resolutions (2016-01-29)
    Open archived version from archive

  • ASN report
    the installation of an EPR at Penly Section map ASN About ASN Activities monitored by ASN The ASN doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home Inspections European stress tests ASN report Print Mettre en favoris Share on Inspections European stress tests Stress Test News Milestones for complementary safety assessments Complementary safety evaluation of French nuclear installations ASN resolutions ASN report Targeted inspections Licensee reports french only European stress tests Stress Test videos Follow up Activities National Action Plans Supervision of the epr reactor ASN report ASN published its report on the complementary safety assessments CSA carried out further to the Fukushima accident in Japan The ASN President André Claude Lacoste delivered it personally to the Prime Minister on 3rd January 2012 Following the complementary safety assessments of the priority nuclear facilities ASN considers that the facilities examined offer a

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests/ASN-report (2016-01-29)
    Open archived version from archive



  •