archive-fr.com » FR » F » FRENCH-NUCLEAR-SAFETY.FR

Total: 531

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Resolution 2011-DC-0218 dated 5 May 2011 from ASN
    translated into English Inspections ASN INSPECTION NEWS Stress tests news Flamanville EPR construction site news European stress tests Milestones for complementary safety assessments ASN resolutions ASN report Targeted inspections Operators reports french only European stress tests CSA Videos Supervision of the epr reactor Principles for the construction of EPR Resources Project concerning the installation of an EPR at Penly Section map ASN About ASN Activities monitored by ASN The ASN doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home References ASN Resolutions Resolution 2011 DC 0218 dated 5 May 2011 from ASN Print Mettre en favoris Share on References International rules Regulations ASN Resolutions ASN Opinions ASN Guides non binding Safety Rules National plan on management of radioactive materials and waste PNGMDR Resolution 2011 DC 0218 dated 5 May 2011 from ASN Published on 16 01 2012 ASN resolution Resolution 2011

    Original URL path: http://www.french-nuclear-safety.fr/References/ASN-Resolutions/Resolution-2011-DC-0218-dated-5-May-2011-from-ASN (2016-01-29)
    Open archived version from archive


  • Resolution 2011-DC-0224 dated 5 May 2011 from ASN
    ASN INSPECTION NEWS Stress tests news Flamanville EPR construction site news European stress tests Milestones for complementary safety assessments ASN resolutions ASN report Targeted inspections Operators reports french only European stress tests CSA Videos Supervision of the epr reactor Principles for the construction of EPR Resources Project concerning the installation of an EPR at Penly Section map ASN About ASN Activities monitored by ASN The ASN doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home References ASN Resolutions Resolution 2011 DC 0224 dated 5 May 2011 from ASN Print Mettre en favoris Share on References International rules Regulations ASN Resolutions ASN Opinions ASN Guides non binding Safety Rules National plan on management of radioactive materials and waste PNGMDR Resolution 2011 DC 0224 dated 5 May 2011 from ASN Published on 16 01 2012 ASN resolution Resolution 2011 DC 0224 dated 5

    Original URL path: http://www.french-nuclear-safety.fr/References/ASN-Resolutions/Resolution-2011-DC-0224-dated-5-May-2011-from-ASN (2016-01-29)
    Open archived version from archive

  • ASN Resolution no. 2011-DC-0213 of 5th May 2011
    INSPECTION NEWS Stress tests news Flamanville EPR construction site news European stress tests Milestones for complementary safety assessments ASN resolutions ASN report Targeted inspections Operators reports french only European stress tests CSA Videos Supervision of the epr reactor Principles for the construction of EPR Resources Project concerning the installation of an EPR at Penly Section map ASN About ASN Activities monitored by ASN The ASN doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home References ASN Resolutions ASN Resolution no 2011 DC 0213 of 5th May 2011 Print Mettre en favoris Share on References International rules Regulations ASN Resolutions ASN Opinions ASN Guides non binding Safety Rules National plan on management of radioactive materials and waste PNGMDR ASN Resolution no 2011 DC 0213 of 5th May 2011 Published on 03 03 2014 ASN resolution ASN Resolution no 2011 DC 0213 of

    Original URL path: http://www.french-nuclear-safety.fr/References/ASN-Resolutions/ASN-Resolution-no.-2011-DC-0213-of-5th-May-2011 (2016-01-29)
    Open archived version from archive

  • Decision N° 2008-DC-0114 by the ASN of 26 September 2008
    Targeted inspections Operators reports french only European stress tests CSA Videos Supervision of the epr reactor Principles for the construction of EPR Resources Project concerning the installation of an EPR at Penly Section map ASN About ASN Activities monitored by ASN The ASN doctrine The ASN strategy The ASN commission The ASN organisation Contact us Technical support ASN s Scientific Committee The IRSN The Advisory Committees Approving organisations and laboratories ASN s other technical support organisations Professional events Radon national action plan workshop International Conference on Modern Radiotherapy 2 4 December 2009 IAEA ASN workshop 22 23 March 2007 Symposium international NuPEER Convention on Nuclear Safety Joint Convention on the safety of spent fuel management IAEA Safety Reviews and Appraisals in France OSART Mission conducted in France WENRA Reports Section map Section map International International reference texts Euratom Treaty IAEA safety standards International conventions Bilateral relations ASN s counterparts Personnel exchanges between ASN and its foreign counterparts Multilateral relations in Europe The European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home References ASN Resolutions Decision N 2008 DC 0114 by the ASN of 26 September 2008 Print Mettre en favoris Share on References International rules Regulations ASN Resolutions ASN Opinions ASN Guides non binding Safety Rules National plan on management of radioactive materials and waste PNGMDR Decision N 2008 DC 0114 by the ASN of 26 September 2008 Published on 28 02 2014 ASN resolution This decision repeals the following decisions Decision N 2013 DC 0347 by the ASN of 7 May 2013 Decision No 2008 DC 0114 of 26

    Original URL path: http://www.french-nuclear-safety.fr/References/ASN-Resolutions/Decision-N-2008-DC-0114-by-the-ASN-of-26-September-2008 (2016-01-29)
    Open archived version from archive

  • CSA: ASN issues its opinion concerning the methodologies adopted by the operators
    assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home Information News releases CSA ASN issues its opinion concerning the methodologies adopted by the operators Print Mettre en favoris Share on Information News releases Publications ASN s videos Back to news list ASN issues its opinion concerning the methodologies adopted by the operators in order to conduct complementary safety assessments in the light of the nuclear accident that occurred at the Fukushima NPP 26 07 2011 3 07 pm Note d information By the resolutions taken on 5 May 2011 the French Nuclear Safety Authority Autorité de sûreté nucléaire ASN has required all operators of relevant basic nuclear installations including AREVA the French Alternative Energies and Atomic Energy Commission Commissariat à l énergie atomique et aux énergies alternatives CEA the French national power utility Électricité de France EDF and the Laue Langevin Institute ILL 1 to submit by 1 June 2011 at the latest a memorandum describing the methodology they adopted in order to conduct the complementary safety assessment évaluation complémentaire de la sûreté ECS for some of their installations with respect to the nuclear accident that occurred at the Fukushima Daiichi Nuclear Power Plant NPP in Japan on 11 March 2011 After reviewing those memoranda 2 ASN considered that the methodological approaches submitted by the operators were on the whole satisfactory as long as they also submit all additional information they have agreed to provide during the analysis and comply with all ASN requests dealing mostly with the following the status of the installation hazards including the assessment of safety margins the robustness against flood and the integration of a scenario involving both

    Original URL path: http://www.french-nuclear-safety.fr/Information/News-releases/CSA-ASN-issues-its-opinion-concerning-the-methodologies-adopted-by-the-operators (2016-01-29)
    Open archived version from archive

  • 2013 - National Action Plans Workshop
    Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home Inspections European stress tests Follow up Activities National Action Plans 2013 National Action Plans Workshop Print Mettre en favoris Share on Inspections European stress tests Stress Test News Milestones for complementary safety assessments Complementary safety evaluation of French nuclear installations ASN resolutions ASN report Targeted inspections Licensee reports french only European stress tests Stress Test videos Follow up Activities National Action Plans 2013 National Action Plans Workshop 2015 National Action Plans Workshop Supervision of the epr reactor Back to news list 2013 National Action Plans Workshop 16 10 2015 3 00 pm Note d information On 26 th April 2012 one year after the Fukushima disaster a joint declaration by ENSREG a grouping of the European national safety regulators and the European Commission concluded the stress tests exercise on the European NPPs This declaration underlined the need to implement a general action plan to ensure that these stress tests are followed by national level measures to improve safety and that these measures are implemented in a consistent manner The conclusions of the European Council of 28 th and 29 th June 2012 confirmed their desire to see such an action plan come about The general action plan dated 25 th July 2012 and drafted by ENSREG makes provision for the publication of a national action plan by the nuclear safety regulator of each State before the end of 2012 and the organisation of a seminar during which the contents of each action plan would be analysed following a period during which these action plans can be consulted by the public This process took place under the auspices of ENSREG and the European Commission which on 28

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests/Follow-up-Activities-National-Action-Plans/2013-National-Action-Plans-Workshop (2016-01-29)
    Open archived version from archive

  • 2015 - National Action Plans Workshop
    ASN s additional demands aiming to clarify certain design provisions of the hardened safety core These demands are part of a defence in depth approach As such they concern measures to prevent and mitigate the consequences of an accident that exceeds the initial design basis limits for all the facilities on a site This approach involves the deployment of external mobile means which will be completed at the end of 2015 France has also decided to supplement these provisions by implementing substantial fixed means ensuring increased robustness against extreme external hazards ASN s commitment to the pan European work on the management of radiological emergency situations with the aim of harmonising population protection measures on either side of national frontiers It is in this context that the associations HERCA Heads of European radiological Protection Competent Authorities and WENRA Western European Nuclear Regulators Association adopted a joint position 3 at the end of 2014 aiming to improve management and cross border coordination in emergency situations As in the preceding exercise the updated national action plans will be examined by all the European safety regulators ENSREG will organise a seminar in April 2015 at which each safety regulator will present its national action plan and answer questions raised by its counterparts and the public ASN recalls the measures concerning the EDF NPPs decided further to the stress tests At the end of the stress tests ASN underlined in its opinion of 3rd January 2012 that it was going to oblige the licensees to take measures to reinforce protection against natural risks earthquakes and flooding or risks associated with other industrial activities and control the accident situations that could result therefrom loss of electrical power supplies loss of heat sinks severe accidents These requirements oblige EDF more specifically to implement a hardened safety core comprising a limited number of equipment resources that can ensure the safety functions in extreme situations This hardened safety core must be as independent from the existing systems as possible particularly regarding the instrumentation and control and the electrical power supply On 21 January 2014 the ASN Commission adopted 19 resolutions specifying the objectives and the constituents of this hardened safety core EDF proposes setting up this hardened safety core in two phases a first phase comprising the setting up of the fundamental elements of the hardened safety core and more specifically for each reactor a large capacity ultimate back up diesel generator set necessitating the construction of a dedicated building a dedicated ultimate water source and ultimate water makeup and the construction on each site of a local emergency response centre capable of withstanding extreme external hazards These provisions will be implemented gradually starting in 2015 and completed for the most part by 2022 a second phase will supplement the first to improve the level of coverage of the potential accident scenarios considered particularly with respect to the potential consequences of severe accidents These means include the finalising of the ultimate makeup connections to the reactor the installation

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/European-stress-tests/Follow-up-Activities-National-Action-Plans/2015-National-Action-Plans-Workshop (2016-01-29)
    Open archived version from archive

  • EPR Pressurised Water Reactor
    European Union Clubs of Nuclear Safety and Radiation Protection Authorities Other organisations Multilateral assistance plans Multilateral relations outside Europe International Atomic Energy Agency Nuclear Energy Agency of the OECD Other UN organisations Other associations of nuclear safety and radiation protection authorities International Commission on Radiological Protection Section map Home Inspections Supervision of the epr reactor ASN s supervision of the Flamanville 3 reactor construction EPR News EPR Pressurised Water Reactor Print Mettre en favoris Share on Inspections European stress tests Supervision of the epr reactor ASN s supervision of the Flamanville 3 reactor construction EPR News ASN s supervision principles for the construction of the Flamanville 3 reactor Resources Project concerning the installation of an EPR type reactor on the Penly site Back to news list Joint Regulatory Position Statement on the EPR Pressurised Water Reactor 02 11 2009 1 57 pm Note d information 1 The UK nuclear safety regulator HSE s ND the French nuclear regulator ASN and the Finnish nuclear regulator STUK are currently working to assess the EPR Pressurised Water Reactor 2 In carrying out individual assessments we have all raised issues regarding the EPR Control and Instrumentation C I systems which the proposed licensees and or the manufacturer AREVA are in the process of addressing 3 Although the EPR design being developed for each country varies slightly the issues we raised with the current C I system are broadly similar our aim being to collectively obtain the highest levels of safety from the EPR 4 The issue is primarily around ensuring the adequacy of the safety systems those used to maintain control of the plant if it goes outside normal conditions and their independence from the control systems those used to operate the plant under normal conditions 5 Independence is important because if a safety

    Original URL path: http://www.french-nuclear-safety.fr/Inspections/Supervision-of-the-epr-reactor/ASN-s-supervision-of-the-Flamanville-3-reactor-construction-EPR-News/EPR-Pressurised-Water-Reactor (2016-01-29)
    Open archived version from archive



  •